Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

Finding the critical path in an activity network with time-switch constraints

Article Abstract:

Careful attention to time issues is required for effective project management. The time-switch constraint model allows for a more realistic evaluation of time issues in project management to ensure proper budget and resource allocations.

Author: Yang Hsu Hao, Chen Yen-Liang
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2000
Taiwan, Statistical Data Included, Industrial project management, Project management

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Evolutionary algorithms for periodic arc routing problems

Article Abstract:

Model of periodic capacitated arc routing problem, which is a network arc routing process, is analyzed. A memetic algorithm is proposed as a solution. Results indicate benefits of integrating planning and operational decisions.

Author: Lacomme, Philippe, Prins, Christian, Ramdane-Cherif, Wahiba
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
Algorithms, Algorithm

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


A theoretical study on the behavior of simulated annealing leading to a new cooling schedule

Article Abstract:

Empirical results of the study on the efficiency of new simulated annealing algorithm to solve traveling salesman problem are presented.

Author: Triki, E., Collette, Y., Siarry, P.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
Analysis, Usage, Simulated annealing (Mathematics), Traveling-salesman problem

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Methods, Network analysis (Planning), France
Similar abstracts:
  • Abstracts: Minimization of the makespan in a two-machine problem under given resource constraints. A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
  • Abstracts: Determination of optimal path under approach and exit constraints. Combined signal setting design and traffic assignment problem
  • Abstracts: IJmuiden to join auction network. Fishermen guide plotter updates. Lake eel business keeps growing
  • Abstracts: The rural postman problem with deadline classes. Developing railway timetables which guarantee a better service
  • Abstracts: Probabilistic linear programming problems with exponential random variables: a technical note. Coordination of cooperative advertising in a two-level supply chain when manufacturer offers discount
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2018 Advameg, Inc.