Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

Activity consolidation to improve responsiveness

Article Abstract:

The concept of consolidation of activities as a vehicle for project planning is introduced. Consolidation eliminates inter-activity delays due to material and information flows, but reduces the amount of parallel graphical processing possible in the graph (consolidated activities are performed sequentially). Both tabu and heuristics are effective to solve the problem, but further research could improve processing efficiency and solution accuracy.

Author: Rummel, Jeffrey L., Seidmann, Abraham, Walter, Zhiping, Dewan, Rajiv
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
Heuristic, Heuristics, Search theory, Graph theory

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Evaluating Web services: towards a framework for emergent contexts

Article Abstract:

A study is conducted on various United Kingdom firms to develop an evaluation framework for Web Services. The study also analyzes the impact of emergent context on the Web evaluation processes.

Author: Ranchhod, Ashok, Hackney, Ray, Xu, Huinan
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
United Kingdom, Evaluation, Web services

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Optimal policies for the sizing and timing of software maintenance projects

Article Abstract:

The performance of work-based policies and time-based policies, which are used to determine the optimal point for software maintenance, is evaluated.

Author: Feng, Qi, Mookerjee, Vijay S., Sethi, Suresh. P.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
United States, Dynamic programming

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Methods, Industrial project management, Project management, Usage
Similar abstracts:
  • Abstracts: A variation of the assignment problem. An O(m log n) algorithm for the max + sum spanning tree problem. Fuzzy disk for covering fuzzy points
  • Abstracts: Tailoring Consulting to business leader needs. HR offshoring - client acceptance slow. Assigning Engagement Resources (part II)
  • Abstracts: Joint determination of production run length and number of standbys in a deteriorating production process. An integrated systems approach to process control and maintenance
  • Abstracts: Reducing simulation models for scheduling manufacturing facilities. A contribution to the stochastic flow shop scheduling problem
  • Abstracts: Definition and properties of the input-weighted average lead-time. part 2 Reliability redundancy allocation: an improved realization for nonconvex nonlinear programming problems
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.