Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

Managing the rise of Asia

Article Abstract:

Southeast Asian countries are growing in prosperity. It is necessary to ensure that such growth is peaceful economically, politically and culturally. Suggestions for achieving such harmonious growth in the region are presented.

Author: Sathirathai, Surakiart
Publisher: Review Publishing Company Ltd. (Hong Kong)
Publication Name: Far Eastern Economic Review
Subject: Business, international
ISSN: 0014-7591
Year: 2005
International politics, Southeast Asia, Political aspects, International relations

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


The tide turns

Article Abstract:

The economy of Pakistan is discussed. The economy is expected to grow at 5.3 percent in 2004 against 5.1 percent last year.

Author: Saeed, Azhar
Publisher: Review Publishing Company Ltd. (Hong Kong)
Publication Name: Far Eastern Economic Review
Subject: Business, international
ISSN: 0014-7591
Year: 2004
Pakistan

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


A mature society embraces prosperity

Article Abstract:

The possible growth of consumerism in India in the next ten years is discussed.

Author: Mahindra, Anand G.
Publisher: Review Publishing Company Ltd. (Hong Kong)
Publication Name: Far Eastern Economic Review
Subject: Business, international
ISSN: 0014-7591
Year: 2006
India, Growth, Consumer advocacy, Consumerism, Company growth

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Economic aspects, Forecasts and trends, Economic development, Market trend/market analysis
Similar abstracts:
  • Abstracts: Engaging the US with trade. Asia drags down the free trade cause. The sent-away kids
  • Abstracts: Failing the grade. Picture perfect. Moving for a living
  • Abstracts: Minimizing the weighted number of tardy jobs on parallel processors. Minimizing the weighted number of tardy jobs on a single machine
  • Abstracts: Using tabu search to schedule activities of stochastic resource-constrained projects. Fuzzy temporal characteristics of operations for project management on the network models basis
  • Abstracts: Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.