Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

The dynamic multilevel assignment problem as a stochastic extremal process

Article Abstract:

The multilevel assignment problem was assessed with the assumption that the utility components for each pairwise matching are stochastic. Such assumption leads to the development of a dynamic version of the multilevel stochastic assignment model in which both demand and supply evaluate alternatives based on stochastic extremal process. The model shows that a structure of a nested-logit model is assumed by the assignment probabilities.

Author: Tadei, Roberto, Ricciardi, Nicoletta
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1999
Operations Research, Analysis, Stochastic processes, Optimization theory, Mathematical programming

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Real time task scheduling allowing fuzzy due dates

Article Abstract:

A cost function called satisfaction function is employed to demonstrate the quality of scheduling in the study of real time scheduling enabling fuzzy due dates. It was found that the proposed algorithm consistently does better than the dichotomic search. Scheduling aims to determine the maximum assignment of priorities so that the satisfaction connected with due dates and execution times be lessened.

Author: Tadei, Roberto, Litoiu, Marin
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1997
Work Schedules, Planning, Work hours, Fuzzy algorithms, Fuzzy logic, Set theory, Industrial management, Fuzzy sets, Real time systems, Real-time systems

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Minimizing tardy jobs in a flowshop with common due date

Article Abstract:

Issues relating to two-machine flowshops, and the need to minimize tardy jobs, are examined in detail, with an algorithm set out and computed.

Author: Della Croce, Federico, Gupta, Jatinder, Tadei, Roberto
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2000
Management Theory & Techniques, Management, Algorithms, Production management

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Research
Similar abstracts:
  • Abstracts: The multiobjective equilibrium network design problem revisited: a simulated annealing approach. Siting noxious facilities under uncertainty
  • Abstracts: Dynamic control of multicommodity fleet management problems. A comparative evaluation of modeling approaches to the labor shift scheduling problem
  • Abstracts: Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process. A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
  • Abstracts: Scheduling multiple variant programs under hard real-time constraint. A cutting plane algorithm for a single machine scheduling problem
  • Abstracts: Optimal segmentation of projects - schedule and cost considerations
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.