Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

Determining a common production cycle time for an economic lot scheduling problem with deteriorating items

Article Abstract:

Solution for an economic lot scheduling problem of a production inventory system involving perishable goods is derived. Time distribution of deterioration is represented using exponential distribution.

Author: Lin, Gary C., Kroll, Dennis E., Lin, C.J.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
Inventories, Functions, Exponential, Exponential functions

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


A polynomial time algorithm for a deterministic joint pricing and inventory model

Article Abstract:

Solution to pricing and economic lot-size problems is derived using polynomial time algorithm.

Author: Heuvel, Wilco van den, Wagelmans, Albert P.M.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
Pricing Policy, Methods, Pricing, Algorithms, Algorithm, Product price

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA



Subjects list: United States, Management, Usage, Company business management, Economic lot size
Similar abstracts:
  • Abstracts: The effect of lot sizing rules on order variability. Solving the competitive discretionary service facility location problem
  • Abstracts: Determination of common due window location in a single machine scheduling problem. Using tabu search with longer-term memory and relaxation to create examination timetables
  • Abstracts: An optimal polynomial time algorithm for the common cycle economic lot and delivery-scheduling problem. Optimal pricing and quantity of products with two offerings
  • Abstracts: Tool allocation and machining conditions optimization for CNC machines. Scheduling with tool changes to minimize total completion time: basic results and SPT performance
  • Abstracts: Common due date scheduling with autonomous and induced learning. A framework for demand point and solution space aggregation analysis for location models
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.