Abstracts - faqs.org

Abstracts

Engineering and manufacturing industries

Search abstracts:
Abstracts » Engineering and manufacturing industries

A clustering analysis of forecasting methods in a multi-objective inventory system

Article Abstract:

Forecasting methods were studied to present a descriptive model interrelating the fundamental issues relevant to inventory management. These issues are estimating cost, length of lead time, demand estimation and performance measurements of inventory systems. The assumptions which define the descriptive model are a single item, uncertain demand, deterministic review order point and discrete lead time. Results show that the naive forecasting method is unique from the other 15 forecasting methods studied. It is also indicated that the suitability of a forecasting method is subject to the characteristics of a time series.

Author: Mehrez, Abraham, Hu, Michael Y.
Publisher: Elsevier Science Publishers
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1992
Models, Forecasting, Inventory control

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


A two-item newsboy problem with substitutability

Article Abstract:

A two-item newsboy problem with substitutability was formulated to address the substitution of a certain amount of an item for another by customers facing a shortage. The upper and lower limits of the items' optimal order quantities were derived, and a Monte Carlo simulation was used to optimally solve the problem. The order quantities yielded by the simulation were shown to provide a bigger expected profit than when substitutability is neglected.

Author: Mehrez, Abraham, Rabinowitz, Gad, Khouja, Moutaz
Publisher: Elsevier Science Publishers
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1996
Usage, Monte Carlo method, Monte Carlo methods, Inventories

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


The scheduling of economic lot sizes on volume flexible production systems

Article Abstract:

An algorithm for the economic lot scheduling problem with production rates managed as decision variables is presented. This is of significance as additional volume-flexible production systems are initiated to the marketplace. The outcomes from the altered prototype indicate that at great demand utilization, volume flexibility is relatively essential as big cost savings can be realized, and the answer to the problem can be found more readily.

Author: Khouja, Moutaz
Publisher: Elsevier Science Publishers
Publication Name: International Journal of Production Economics
Subject: Engineering and manufacturing industries
ISSN: 0925-5273
Year: 1997
Production Planning & Control, Management, Production management, Production control, Economic lot size

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Research
Similar abstracts:
  • Abstracts: Dynamic analysis of change in decisional structures of production systems. Use of simulation for planning of work organization in highly automated production systems - two case studies
  • Abstracts: VIA Rail puts the brakes on runaway operations. Small in size but not in stature. Consultant
  • Abstracts: Match color measuring tools to your needs. Measuring special-effect colors
  • Abstracts: Impact of various flexibility types in a hybrid fabrication/assembly production system. Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times
  • Abstracts: Decision support tool for justifying alternative manufacturing and production control systems. Developing a full business environment to support just-in-time logistics
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.