Coded warning

Article Abstract:

The main members of the ECA and HVCA have launched a voluntary code of practice which will regulate members' business practices. Members of the group will have to specify finish dates for their work, use normal contracts and have payment terms as specified in JCT contracts. These rules will also be applied to subcontractors. The HVCA's Ductwork Group has also implemented a similar code on its members. Guidance notes have been produced to help members comply with the code. Members cannot be compelled to work within the code and this may cause the system to fall down.

Author: Brister, Andrew
Publisher: ECA Publications Ltd. (UK)
Publication Name: Electrical Contractor
Subject: Engineering and manufacturing industries
ISSN: 0308-7174
Year: 1997
Management, Quality management, Trade and professional associations, Professional associations, Trade associations, Professional ethics

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


The troubleshooters: a revitalized Electrical Industry Forum is tackling some of the major issues facing both the contracting and the supply side of the industry

Article Abstract:

The Electrical Industry Forum's Mission Statement aims to bring all the various constituents of the electrical building services industry together and pursue common aims. It is the first time that the industry has had a single body to support it and the first priority of the EIF is the issue of lifetime value for money to increase competitiveness. The EIF also hopes to influence government decision makers, possibly through the planned Building Services Alliance backed by the DoE.

Author: Brister, Andrew
Publisher: ECA Publications Ltd. (UK)
Publication Name: Electrical Contractor
Subject: Engineering and manufacturing industries
ISSN: 0308-7174
Year: 1997
Associations, Electrical engineering

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Bold Trafford

Article Abstract:

The 600 million pounds sterling Trafford Centre in Manchester, England, offers over 1.4 million sq ft of shopping space and is designed to last for 150 years. The centre's services element cost 50 million pounds sterling, with the largest single contractor being electrical specialist Drake and Skull, providing more than 200 km of wiring.

Author: Brister, Andrew
Publisher: ECA Publications Ltd. (UK)
Publication Name: Electrical Contractor
Subject: Engineering and manufacturing industries
ISSN: 0308-7174
Year: 1998
Retail trade, Contracts, Design and construction, Shopping centers, Manchester, England, Drake and Scull Holdings Ltd.

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Electricians
Similar abstracts:
  • Abstracts: At last - good training news. Training for quality. Learning desire
  • Abstracts: The product parenting process. COPIS focus
  • Abstracts: Lose the waste, get lean. Learning to lead a virtual team
  • Abstracts: Waste not, want not. Tracking faults. Unity in Cyprus
  • Abstracts: Well schooled in lighting. Seal and deliver .... Verifying the lighting design performance
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.