The points discussed by H. Yucel Ersoz have merit and should be considered when implementing an artificial neural network (ANN). The development of ANNs usually generates a huge amount of data because it should represent the system being modeled as accurately as possible. The latter has already been used at a big construction company to estimate the productivity of pipe welding, fitting and handling operations. It showed better performance than currently available methods.

Author: AbouRizk, Simaan
Publisher: American Society of Civil Engineers
Publication Name: Journal of Construction Engineering and Management
Subject: Science and technology
ISSN: 0733-9364
Year: 1999

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Neural network model for estimation construction productivity

Article Abstract:

J. Portas and S. AbouRizk should be lauded for studying the effects of work conditions on the productivity of construction crews. The neural network they propose for measuring construction productivity is valid and can be applied in practice. It has its disadvantages but is a significant contribution to the field of cost estimating. However, the system can only produce results if the construction company makes the required changes in its management information systems.

Author: Ersoz, H. Yucel
Publisher: American Society of Civil Engineers
Publication Name: Journal of Construction Engineering and Management
Subject: Science and technology
ISSN: 0733-9364
Year: 1999

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Model for construction budget performance - neural network approach

Article Abstract:

D.K. Chua and his associates used the RMS classification error as a measure of how well their neural network predicts actual results. However, they should have specified the relationship between classification error values and the levels of actual performance. They also failed to explain why the input variables were reduced from 27 to eight. They should also have included the variables with the greatest percentage change in the reduced eight-variable model.

Author: Weber, Sandra L.
Publisher: American Society of Civil Engineers
Publication Name: Journal of Construction Engineering and Management
Subject: Science and technology
ISSN: 0733-9364
Year: 1999
Business budgets

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Models, Construction industry, Computer networks, Finance, Measurement, Neural networks, Industrial productivity
Similar abstracts:
  • Abstracts: Colloidal pumping: evidence for the coagulation process using natural colloids tagged with 203Hg. Colloidal and particulate silver in river and estuarine waters of Texas
  • Abstracts: Aqueous solubility depression for hydrophobic organic chemicals in the presence of partially miscible organic solvents
  • Abstracts: Simultaneous determination of Iron(III), Iron(II), and Manganese(II) in environmental samples by ion chromotography
  • Abstracts: Biotransformations of selenium oxyanion by filamentous cyanophyte-dominated mat cultured from agricultural drainage waters
  • Abstracts: A thermodynamical theory of plastic spin and internal stress with dislocation density tensor. Application of the Taylor polycrystal plasticity model to complex deformation experiments
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.