Journal of Construction Engineering and Management |
Title | Subject | Authors |
Advanced fabrication and erection techniques for long suspension bridge cables. (comment on Minoru Matsuzaki, Journal of Construction Engineering and Management, vol. 116, no. 1, March 1990) (Discussions) | Science and technology | Birdsall, Blair |
Analysis of earth-moving systems using discrete-event simulation. (response to S.D. Smith, Journal of Construction Engineering, vol. 121, no. 4, December 1995) | Science and technology | Schexnayder, C.J. |
Bidding strategy: winning over key competitors. | Science and technology | Griffis, F. H. |
BID-SPREAD.(Brief Article) | Science and technology | Skitmore, Martin, Drew, Derek, Ngai, Stephen |
Bored tunneling for Singapore Metro. (mass transit system) | Science and technology | Hulme, T.W., Burchell, A.J. |
Causes of quality deviations in design and construction. (industrial construction projects) | Science and technology | Burati, James L., Jr., Farrington, Jodi J., Ledbetter, William J. |
"Claimsmanship": current perspective. (response to James G. Zack, Jr., Journal of Construction Engineering and Management, vol. 119, September 1993) | Science and technology | Ossman, George, III |
Closure (2).(response to article by Sandra L. Weber in this issue, p. 213) | Science and technology | Chua, D.K.H., Kog, Y.C., Loh, P.K., Jaselkis, E.J. |
Closure.(response to article by H. Yucel Ersoz in this issue, p. 211) | Science and technology | AbouRizk, Simaan |
Computer-aided concrete-placement optimization. (comment on R.S. Phelan et al, Journal of Construction Engineering and Management, vol. 116, no. 1, March 1991) (Discussions) | Science and technology | Alkass, S.T., Moselhi, O. |
Constructability and constructability programs: white paper. (comment on paper of the Construction Management Committee of the American Society of Civilengineers Construction Division, Journal of Construction Engineering and Management, vol. 117, March 1991) | Science and technology | Sheehan, John M. |
Constructability for drilled shafts. | Science and technology | Turner, John P. |
Construction automation: demands and satisfiers in the United States and Japan. (response to John G. Everett and Hiroshi Salto, Journal of Construction Engineering and Management, vol. 122, June 1996) | Science and technology | Bernhold, Leonhard E. |
Construction claims and disputes: causes and cost/time overruns. (response to Cheryl Semple et al., Journal of Construction Engineering and Management, vol. 120, December 1994) | Science and technology | Goyal, Brij B., McDonald, Donald F. |
Construction cost factors in Nigeria. (response to A. Uchechukwu Elinwa and Silas A. Buba, Journal of Construction Engineering and Management, vol. 119, December 1993) | Science and technology | Nebiker, John H. |
Construction of grout-impregnated fabric-reinforced pipes. | Science and technology | Nicholls, Robert |
Critical success factors for construction projects. | Science and technology | Sanvido, Victor, Grobler, Francois, Parfitt, Kevin, Guvenis, Moris, Coyle, Michael |
Critical success factors in winning BOT contracts. (build-operate-transfer) | Science and technology | Tiong, Robert L.K., Khim-Teck Yeo, McCarthy, S.C. |
CSFs in competitive tendering and negotiation model for BOT projects. (response to Robert L.K. Tiang, Journal of Construction Engineering and Management, vol. 122. Sep 1996) | Science and technology | Gupta, M.C., Narasimham, S.V. |
Effects of scheduled overtime on labor productivity. | Science and technology | Thomas, H. Randolph |
Evaluation of new building technology. (comment on James D. Lutz et al, Journal of Construction of Engineering and Management, vol. 116, no. 2, June, 1990) (Discussions) | Science and technology | Finch, Edward |
Exchange Place Station subsurface reconstruction and improvements. (Port Authority Trans Hudson Railroad's Exchange Place Station) | Science and technology | Kerr, William C., Tamaro, George J., Hahn, Daniel M. |
Expert system for equipment selection for earth-moving operations. | Science and technology | Amirkhanian, Serji N., Baker, Nancy J. |
Financial performance analysis for construction industry. | Science and technology | Kangari, Roozbeh, Farid, Foad, Elgharib, Hesham M. |
Formal development of line-of-balance technique. (Journal of Construction Engineering and Management, vol. 116, no. 4, December 1990) (Discussions) | Science and technology | Vorster, Michael C., Bafna, Tarun |
Integrated data-base systems. | Science and technology | Gibson, George E., Jr., Bell, Lansford C. |
Knowledge acquisition and development for formwork selection system. | Science and technology | Hanna, Awad S., Willenbrock, Jack S., Sanvido, Victor E. |
Management of engineering/design phase. (comment on Neil N. Eldin, Journal of Construction Engineering and Management, vol 117, March 1991) | Science and technology | Werner, Richard L. |
Method proposed for construction of multispan cable-stayed bridges. | Science and technology | Dilger, W.H., Tadros, G.S., Giannelia, P. |
Model for construction budget performance - neural network approach.(response to article by D.K.H. Chua et al., Journal of Construction Engineering and Management, vol. 123, September 1997) | Science and technology | Weber, Sandra L. |
Monte Carlo technique with correlated random variables. (statistical analysis of construction projects) | Science and technology | Touran, Ali, Wiser, Edward P. |
Multiparameter bidding system - innovation in contract administration. | Science and technology | Herbsman, Zohar, Ellis, Ralph |
Need for specification format that accommodates engineered projects. (response to James T. O'Connor and Patrick H. Caraway, Journal of Construction Engineering and Management, vol. 119, December 1993) | Science and technology | Barger, Charles S. |
Neural network model for estimation construction productivity.(response to Jason Portas and Simaan AbouRizk, Journal of Construction Engineering and Management, vol. 123, December 1997) | Science and technology | Ersoz, H. Yucel |
Noncontractual methods of integration on construction projects. | Science and technology | Nam, C.H., Tatum, C.B. |
Potential gains through welded-wire fabric reinforcement. | Science and technology | Bernold, Leonhard E., Chang, Peter |
Process of planning during construction. | Science and technology | Thomas, Albert A. |
Prospects for no-dig technology in Hong Kong construction industry. (response to S.H. Pau et al, Journal of Construction Engineering and Management, vol. 119, September 1993) | Science and technology | Lai, Lawrence W.C., Chau, K.W., Ho, Daniel C.W. |
Quality management organizations and techniques. | Science and technology | Burati, James L., Jr., Matthews, Michael F., Kalidindi, Satyanarayana N. |
Rational equipment selection method based on soil conditions.(includes reply)(response to Ali Touran and Thomas C. Sheahan, Journal of Construction Engineering and Management, vol. 123, Mar 1997) | Science and technology | Schexnayder, Cliff |
R&D cooperation by Swedish contractors. (construction industry research and development) | Science and technology | Brochner, J., Grandinson, B. |
Risk management perceptions and trends of U.S. construction. (response to Roozbeh Kangari, Journal of Construction Engineering and Management, vol. 121, no. 4, December 1995) | Science and technology | Connolly, Joseph P. |
Selection of design/build proposal using fuzzy-logic system. | Science and technology | Paek, James H., Lee, Yong W., Napier, Thomas R. |
SIMULATION OF CONCRETE BATCH PLANT PRODUCTION.(Brief Article) | Science and technology | Zayed, Tarek M., Halpin, Daniel |
Strategies in risk management of on-demand guarantees. (contract guarantees for contractor's failure to perform obligation) | Science and technology | Tiong, Robert L.K. |
Substitutes for leadership and unionized construction carpenters. | Science and technology | Federle, Mark O., Maloney, William F. |
SuperChange: expert system for analysis of change claims. | Science and technology | Diekmann, James E., Kim, Moonja P. |
Systematic risk management approach for construction projects. (comment on Jamal F. Al-Bahar and Keith C. Crandall, Journal of Construction Engineering and Management, vol. 116, September 1990) | Science and technology | McKim, R.A. |
Technology transfer in building construction - case of seismic design. | Science and technology | Nam, C.H., Tatum, C.B., Cushman, Nancy S. |
The contractor-subcontractor relationship: the subcontractor's view. (response to article by Jimmie Hinze and Andrew Tracey, Journal of Construction Engineering and Management, vol. 120, Jun. 1994)(includes reply) | Science and technology | Borg, Robert F. |
Time is money: innovative contracting methods in highway construction. (comments on article by Zohar J. Herbsman, Wei Tong Chen, William C. Epstein, Journal of Construction Engineering and Management, vol. 121, Sept. 1995) | Science and technology | Brown, L. Kent |
Time-lapse video applications for construction project management.(includes reply)(response to John G. Everett, vol. 124, no. 3, May/June 1998) | Science and technology | Kannan, Govindan, Everett, John G. |
Using quality circles to raise productivity and quality of work life. | Science and technology | Rosenfeld, Yehiel, Warszawski, Abraham, Laufer, Alexander |