Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept

Article Abstract:

Application of critical chain concept, to measure criticality index and cruciality index during project scheduling in stochastic networks, is described.

Author: Ghomi, S.M.T. Fatemi, Rabbani, M., Jolai, F., Lahiji, N.S.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2007
Industrial project management, Project management, Stochastic processes

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Optimal control of service rates and arrivals in Jackson networks

Article Abstract:

Usage of stochastic models and statistical analysis for management of service rates and fresh arrivals at service centers is described.

Author: Azaron, Amir, Ghomi, S.M.T. Fatemi
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2003
Research and Development in the Physical, Engineering, and Life Sciences, Management Development, Statistics, Service Industries, Models, Services industry, Learning models (Stochastic processes), Statistics (Mathematics), Mathematical statistics

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains

Article Abstract:

A study examines scheduling problem relating to lot and delivery systems in supply chain. A genetic algorithm is used in the study.

Author: Ghomi, S.M.T. Fatemi, Torabi, S.A., Karimi, B.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
Scheduling (Management), Genetic algorithms, Supply chains

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Methods, Management, Iran, Company business management, Usage
Similar abstracts:
  • Abstracts: Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems. Lower bounds for resource-constrained project scheduling problems
  • Abstracts: An improved algorithm for cyclic flowshop scheduling in a robotic cell. A polynomial algorithm for 2 degree cyclic robot scheduling
  • Abstracts: A goal programming procedure for solving problems with multiple fuzzy goals using dynamic programming. An interactive method for inventory control with fuzzy lead-time and dynamic demand
  • Abstracts: Territorial cohesion: An unidentified political objective. Towards a European Territorial cohesion assessment network: A bright future for ESPON
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.