Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

Performance enhancements to tabu search for the early/tardy scheduling problem

Article Abstract:

Three techniques are investigated to determine whether they can enhance the performance of tabu search (TS) in solving early/tardy scheduling problems. The three strategies, which used a combination of two previously published candidate selection strategies, included an extra diversification phase in the search and used a composite TS method that utilized two different solution spaces, all demonstrated an ability to enhance TS performance by at least 5%.

Author: James, R. J. W., Buchanan, J. T.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1998
Scheduling (Management)

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Goal programming: application in the management of the miombo woodland in Mozambique

Article Abstract:

Research describing natural resource management by means of goal programming techniques is presented. In particular the application of such models to woodland management in Mozambique is investigated.

Author: Nhantumbo, I., Dent, J.B., Kowero, G.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001
Models, Management, Natural resources, Forest management

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Minimizing mean squared deviation of completion times with maximum tardiness constraint

Article Abstract:

A nonpreemptive single-machine scheduling problem for reducing mean squared deviation of job completion times, is considered.

Author: Hwa Seo, Jong, Ki, Chae-Bogk, Lee, Dong Hoon
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2001

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Operations research, Methods, Management science
Similar abstracts:
  • Abstracts: An iterative improvement approach for the nonpreemptive open shop scheduling problem. A hybrid genetic algorithm for the open shop scheduling problem
  • Abstracts: The use of genetic algorithms to solve the economic lot size scheduling problem. Basket problems in margin calculation: Modelling and algorithms
  • Abstracts: A fuzzy multi-objective programming approach for optimal management of reservoir watershed. Fuzzy linear programming based on statistical confidence interval and interval-valued fuzzy set
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.