Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

Minimizing maximum lateness under linear deterioration

Article Abstract:

The single machine scheduling problem is considered.

Author: Bachman, Aleksander, Janiak, Adam
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2000
Operations Research, Management science, Observations

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Single machine group scheduling with resource dependent setup and processing times

Article Abstract:

Single machine scheduling problem is studied with resource dependent parameters and processing times constraints under group technology method.

Author: Janiak, Adam, Kovalyov, Mikhail Y., Portmann, Marie-Claude
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2005
Group technology

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Scheduling in a contaminated area: a model and polynomial algorithms

Article Abstract:

A study examines job scheduling by workers at workplaces, which are contaminated by radio-active material. Polynomial algorithms are used to address the issue.

Author: Janiak, Adam, Kovalyov, Mikhail Y.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
Algorithms, Algorithm, Symmetric functions

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Methods, Scheduling (Management), Analysis, Usage, Poland
Similar abstracts:
  • Abstracts: Scheduling about a common due date with job dependent asymmetric earliness and tardiness penalties. A genetic algorithm for scheduling staff of mixed skills under multi-criteria
  • Abstracts: The multi-mode resource-constrained project scheduling problem with generalized precedence relations. An effective implementation of the Lin-Kernighan traveling salesman heuristic
  • Abstracts: Solving the shortest route cut and fill problem using simulated annealing. Computational analysis of a flexible assembly system design problem
  • Abstracts: Replay TV to stop direct sales and shift focus to licensing. Vioxx recall raises questions on FDA's safety monitoring
  • Abstracts: Shell may be returning as suitor for Australia's Woodside Petroleum. Woodside expects soaring 2000 profit
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.