Abstracts - faqs.org

Abstracts

Business, international

Search abstracts:
Abstracts » Business, international

The two-machine total completion time flow shop problem

Article Abstract:

The NP-hard scheduling problem of minimizing total completion time in a two-machine flow shop is examined. Five known lower bounds and two new ones are shown. Various versions of a branch and bound method are developed by using, both individually and combined, these lower bounds. A heuristic process which employs a constructive O(n squared) time method, which calculates a good starting solution and a neighborhood search based on pairwise interchanges, is shown.

Author: Croce, F. Della, Tadei, R., Narayan, V.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 1996
Models, Heuristic programming, Branch and bound algorithms

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


A greedy-based neighborhood search approach to a nurse rostering problem

Article Abstract:

A practical nurse rostering problem of an Italian hospital is considered. The nurse rostering is required to generate the nursing staff shifts subject to various operational and contractual requirements.

Author: Bellanti, F., Carello, G., Croce, F. Della, Tadei, R.
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2004
Italy, HEALTH SERVICES, Offices of All Other Miscellaneous Health Practitioners, Offices of health practitioners, not elsewhere classified, Nurses, Human resource management, Health care industry, Company personnel management

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Scheduling trainees at a hospital department using a branch-and-price approach

Article Abstract:

A study uses integer programming to examine scheduling of the work of trainees in a hospital.

Author: Demeulemeester, Erik, Belien, Jeroen
Publisher: Elsevier B.V.
Publication Name: European Journal of Operational Research
Subject: Business, international
ISSN: 0377-2217
Year: 2006
Belgium, Analysis, Training, Integer programming

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Usage, Scheduling (Management), Management, Hospitals, Company business management
Similar abstracts:
  • Abstracts: Minimizing total completion time and total deviation of job completion times from a restrictive due-date. Scheduling with general job-dependent learning curves
  • Abstracts: The combined cutting stock and lot-sizing problem in industrial processes. Stock selection heuristics for interdependent items
  • Abstracts: The application of information and communication technologies in transport
  • Abstracts: BP moves to clean up troubles: guilty plea on 2005 blast, trading-charges settlement expected to come tomorrow
  • Abstracts: The stealth of days are over... it's about time we evolved. A wave of reality should bring a more realistic perspective
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.