Abstracts - faqs.org

Abstracts

Construction and materials industries

Search abstracts:
Abstracts » Construction and materials industries

Whole-life cost model

Article Abstract:

Tabular data indicates the whole-life costs of two differently-sized learning resource centres. These buildings are increasingly important in educational establishments, accommodating electronic media alongside printed materials. The fact that operating costs form an important part of educational finance increases the relevance of whole-life costing. Data relating to the 2,000 square meter learning resource centre for the Surrey Institute of Art and Design, Farnham, England, gives the specifications and whole-life costs for this building.

Publisher: Builder Group plc
Publication Name: Building
Subject: Construction and materials industries
ISSN: 0007-3318
Year: 1999
Finance, Universities and colleges, Buildings and facilities, Instructional materials centers, Media centers (Education)

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Cost model update

Article Abstract:

Examples from different types of building project indicate current trends relating to building costs in the South-east of England. Each building type example includes all-in estimating rates and all-in cost planning rates. Factors affecting costs in the business park development sector, for example, include the quality of the design, fire regulations relating to the height of the first floor, and the decision about whether or not to include facilities buildings in the original design.

Publisher: Builder Group plc
Publication Name: Building
Subject: Construction and materials industries
ISSN: 0007-3318
Year: 1999
Construction industry, Real estate developers, Prices and rates

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Similar abstracts:
  • Abstracts: Cost model. Cost study. Whole-life cost model
  • Abstracts: Whole-life cost model. Cost update
  • Abstracts: Cost model. Money back guarantee. Spoiling for a fight
  • Abstracts: Cost study. Cost model: football stadia. Cost model: leisure centres
  • Abstracts: Cost model. part 4
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.