Crossed wires

Article Abstract:

Digital Services has bridged the gap between cabling and communication contractors by undertaking to install the wiring and organise interior and exterior fit-out and decoration. This allows clients to have one point of contract rather than several, resulting in better coordination and speed. Its building package has so far been supplied to British Gas Exploration and Terry's of York. Mercury Communications is offering clients regional project manager advice who work with the different contractors. Quantity surveyors Mooney Kelly advises Pilkington Communication systems on construction industry dealings.

Author: Macneil, James
Publisher: Builder Group plc
Publication Name: Building
Subject: Construction and materials industries
ISSN: 0007-3318
Year: 1992
Telephone and telegraph apparatus, Installation, Services, Mercury Communications PLC, Cables, Digital Services of Nevada Inc., Mooney Kelly

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Coping with stresses

Article Abstract:

Engineers are increasingly using computers as software becomes more user-friendly. Computers make routine work, such as stressing and calcluations easier and faster. Graphic interfaces and electronic links with comnputer-aided design systems simplifies work. Mott MacDonald has developed 2 packages built inside AutoCAD that enables different work to be undertaken without changing programs. SASMATE is a general 2D structural analysis and design system and CADDET a reinforced concrete detailing system.

Author: Macneil, James
Publisher: Builder Group plc
Publication Name: Building
Subject: Construction and materials industries
ISSN: 0007-3318
Year: 1993
Innovations, Software, Computer-aided design, Computer aided design, Engineers

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Double crossing

Article Abstract:

The 300 million pounds sterling Second Severn Crossing, being built by a joint venture of GTM-Entrepose and John Laing Construction, is nearing completion. It is more than 5 km long, and has used 400,000 cu mt of concrete and 50,000 tonnes of steel. The project has taken four years, and work has had to be carried out in very difficult conditions, with the weather being very unpredictable. All components used were specially selected for their ability to perform in these conditions.

Author: Macneil, James
Publisher: Builder Group plc
Publication Name: Building
Subject: Construction and materials industries
ISSN: 0007-3318
Year: 1995
Bridge and Tunnel Construction, Bridges Construction, Wales, Bridge construction

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA

Similar abstracts:
  • Abstracts: Lead times. International costs
  • Abstracts: Street cred. Double base. Ringing the changes
  • Abstracts: Olympic trials. Name dropping. Anneka moves house
  • Abstracts: Encouragingly clever. Building vision. Civil action
  • Abstracts: Spreading the net. Ulster builders face new safety checks. Health and safety control on site
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.