Construction quality auditing

Article Abstract:

Construction quality auditing is a technique used to examine and enhance the performance of transportation construction and design projects. This method is applied in cases wherein conformance with plan specifications are analyzed, deficiencies in the project are eliminated and the process of information retrieval and reporting are speeded up. The effectiveness of this method can be ensured through the use of trained auditors, specific audit processes and cooperation between contractor and auditor.

Author: Calder, Doug A.J.
Publisher: American Society of Civil Engineers
Publication Name: Journal of Management in Engineering
Subject: Engineering and manufacturing industries
ISSN: 0742-597X
Year: 1997
Methods, Auditing

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Managing change orders and claims

Article Abstract:

Disputes between a project owner and a contractor over change orders and claims can be successfully managed by establishing a dispute prevention and resolution system prior to construction. This may be in the form of a partnership, a dispute review board or incentives. Likewise, claims may be resolved through tools which identify claim events and monitor added costs. These include daily progress reports, payroll registers, cost ledgers, project schedules and invoices.

Author: Cox, Robert K.
Publisher: American Society of Civil Engineers
Publication Name: Journal of Management in Engineering
Subject: Engineering and manufacturing industries
ISSN: 0742-597X
Year: 1997
Interpretation and construction, Cases, Construction law, Contractors

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Documenting defensively

Article Abstract:

An escrow bid document (EBD) is an instrument that can be used to prevent legal conflicts and claims in construction contracts. EBD, which contains information used by a bidder to determine the appropriate bid price, is used in alternative dispute proceedings to settle conflicting claims. The report titled 'Avoiding and Resolving Disputes During Construction - Successful Practices and Guidelines' features several cases on EBD.

Author: Schroedel, Ralph B.
Publisher: American Society of Civil Engineers
Publication Name: Journal of Management in Engineering
Subject: Engineering and manufacturing industries
ISSN: 0742-597X
Year: 1997
Usage, Reports, Dispute resolution (Law), Escrows

User Contributions:

Comment about this article or add new information about this topic:

CAPTCHA


Subjects list: Construction, Contracts, Building
Similar abstracts:
  • Abstracts: Category 3: strategic quality planning. A failure of methods, not philosophy
  • Abstracts: Control Centre. Quality time
  • Abstracts: Collaboration, cooperation, and celebration. Getting the most from an over-the-hill body
  • Abstracts: Research for the next generation of quality. Improving business-education relationships
  • Abstracts: Optimal development of production technology when autonomous and induced learning are present. The first step in planning group technology
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible.
Some parts © 2025 Advameg, Inc.